Monday, May 7, 2012

Scroll and Peg Box



I have been working on the scroll for quite a while trying to make it as good as can be, but it could still be better.

I have also cut out the peg box.

Monday, April 2, 2012

Label Installed and Box Closed

I finally got my label printed and installed!

I also closed the box today!

Monday, March 26, 2012

The Scroll and Fingerboard Outline


I got help from Mr. Reed drawing on the outline of the scroll. I made a series of cuts to start forming the towers, unfortunately I did not get pictures of this.

Wednesday, March 21, 2012

Linings leveld, Blocks Shaped, and more Neck Work

I don't have any pictures for today, but the linings have been leveled (see picture in previous post), the blocks have been shaped, and I spent most of the day on a spindle sander getting the outline of the scroll finished up.

Monday, March 19, 2012

Removing Mold and Installing Linings

It took me all of one minute to remove the mold from the rib structure.


I have already leveled the linings in this picture.
I also installed the linings.

Wednesday, March 14, 2012

Back Glued On and Started on Neck Block

I glued the back onto the rib structure today.

I also cut out the shape of the neck using the band saw.

Monday, March 12, 2012

Bass Bar Finished and Locating Pins

The bass bar is now finished being shaped.


I also made locating pins to line the plates exactly where they need to be.

Saturday, March 10, 2012

Bass Bar Installed and Rough Shaped

I was able to get the bass bar glued on and rough shaped out side of class time.

Wednesday, February 29, 2012

Bass Bar

I have started on the bass bar shape and have cleats glued down (not pictured yet) to keep location of the bass bar during the fitting process.

Monday, February 27, 2012

F-holes Finished


I have been working outside of class to try to get ahead, and it is starting to pay off. As a result, my f-holes are done ahead of schedule!

Wednesday, February 22, 2012

Graduations Complete

After much pain from blisters, my graduations are now finished.




Saturday, February 18, 2012

F-holes Started

I cut the f-holes out before the graduations were completed so that the top still had some strength while using the coping saw. I unfortunately did not get a picture of this process.

Monday, January 30, 2012

Holes Drilled for first Graduations

I used a drill press to accurately drill to 4.5 mm in the top and 6 mm in the back.  This will indicate where the rough graduations will stop. After this, I will do a second drilling for the final graduations.

Monday, January 23, 2012

Finished with the Arches

 It took longer that expected, but the arching is now finished.
I used a contour gauge to trace the arches to see their shape more accurately.